Service manual
11
7.Installation details
7.1 Wrench torque sheet for installation
Outside diameter Torque
mm inch Kg.m
φ6.35 1/4 1.8
φ12.7 1/2 5.5
7.2 Connecting the cables
The power cord of connect should be selected according to the following specifications sheet.
Grade
Unit
18K
mm
2
2.5
7.3 Pipe length and the elevation
Pipe size
Capacity
Btu/h
GAS LIQUID
Standard
length
(m)
Max.
Elevation
B (m)
Max.
Pipe
length
A (m)
Additional
refrigerant
(g/m)
18K 1/2’’ (φ12.7)
1/4’’ (φ6.35)
5 8 15 30
Caution:
Capacity is base on standard length and maximum allowance length is base of reliability.
Oil trap should be install per 5-7 meters.
In case that
more than