EasyManua.ls Logo

Carrier 38QUS012D8S - Page 80

Carrier 38QUS012D8S
153 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Indoor unit installation
Installation 78
3.3 A6 duct indoor unit installation
3.3.1 Service space for indoor unit
3.3.2 Bolt pitch
Capacity(KBtu)
Size of outline dimension mounted lug
L
M
18
920
508
24
1140
598
36
1400
598
48/55
1240
697
3.3.3 Hang indoor unit
1. Please refer to the upper data to locate the four positioning screw bolt hole on the ceiling. Be sure to mark
the areas where ceiling hook holes will be drilled.
2. Install and fit pipes and wires after you have finished installing the main body. When choosing where to
start, determine the direction of the pipes to be drawn out. Especially in cases where there is a ceiling
involved, align the refrigerant pipes, drain pipes, and indoor and outdoor lines with their connection points
before mounting the unit.
3. Install hanging screw bolts.
Cut off the roof beam.
Strengthen the place that has been cut off, and consolidate the roof beam.

Related product manuals