START-UP CHECKLIST (cont)
HAS PIPING SYSTEM BEEN EVACUATED TO 1000 MICRONS?
HAS SYSTEM CHARGE BEEN WEIGHED IN (IF REQUIRED)?
HAVE SERVICE VALVES BEEN FULLY BACKSEATED?
CHECK VOLTAGE: IS VOLTAGE WITHIN RANGE SHOWN FOR UNIT (WITH UNIT OPERATING)?
OUTDOOR INDOOR
IV. START-UP
IF UNIT HAS A CRANKCASE HEATER, HAS IT BEEN ON FOR 24 HOURS?
MEASURE AND RECORD THE:
AIR ENTERING OUTDOOR UNIT:
F
AIR ENTERING INDOOR UNIT:
F
DISCHARGE LINE TEMPERATURE:
F
VAPOR LINE TEMPERATURE:
F
MEASURE AND RECORD THE:
VAPOR LINE PRESSURE:
PSIG
DISCHARGE PRESSURE:
PSIG
----------------------------------------------------------------------------------------
CUT ALONG DOTTED LINE CUT ALONG DOTTED LINE
Copyright 1999 Carrier Corporation
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 1 4
Tab 3e 2f
PC 111 Catalog No. 534-003 Printed in U.S.A. Form 40QN-4SI Pg CL-2 5-99 Replaces: 40QN-1SI