EasyManua.ls Logo

Carrier 48/50PD05 - Unit Start-Up Checklist; Pre-Start-Up and Start-Up Steps

Carrier 48/50PD05
106 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
105
UNIT START-UP CHECKLIST
MODEL NO.:
DATE: ______________
SERIAL NO: _____________________________________
TECHNICIAN: ___________________________________
I. PRE-START-UP:
j VERIFY THAT ALL PACKAGING MATERIALS HAVE BEEN REMOVED FROM UNIT
j VERIFY INSTALLATION OF OUTDOOR AIR HOOD
j VERIFY INSTALLATION OF FLUE EXHAUST AND INLET HOOD (48PD ONLY)
j VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTALLATION INSTRUCTIONS
j VERIFY THAT ALL ELECTRICAL CONNECTIONS AND TERMINALS ARE TIGHT
j VERIFY GAS PRESSURE TO UNIT GAS VALVE IS WITHIN SPECIFIED RANGE (48PD ONLY)
j CHECK GAS PIPING FOR LEAKS (48PD ONLY)
j CHECK THAT INDOOR -- AIR FILTERS ARE CLEAN AND IN PLACE
j CHECK THAT OUTDOOR AIR INLET SCREENS ARE IN PLACE
j VERIFY THAT UNIT IS LEVEL
j CHECK FAN WHEELS AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND VERIFY SETSCREW IS TIGHT
j VERIFY THAT FAN SHEAVES ARE ALIGNED AND BELTS ARE PROPERLY TENSIONED
j VERIFY THAT SCROLL COMPRESSORS ARE ROTATING IN T HE CORRECT DIRECTION
j VERIFY INSTALLATION OF SPACE SENSOR
j VERIFY CONFIGURATION VALUES FOR ELECTRONIC CONTROLS (REFER TO CONTROL SET UP CHECKLIST)
j VERIFY THAT CRANKCASE HEATERS HAVE BEEN ENERGIZED FOR AT LEAST 24 HOURS
j VERIFY THAT THE VFD IS IN AUTO MODE
II. START-UP
ELECTRICAL
SUPPLY VOL TAGE L1--L2 L2--L3 L3--L1
COMPRESSOR AMPS—COMPRESSOR A1 L1 L2 L3
—COMPRESSOR B1 L1
L2 L3
—COMPRESSOR C1 L1 L2 L3
ELECTRIC HEAT AMPS (IF EQUIPPED) L1 L2 L3
SUPPL Y F AN AMPS
_______
L1 L2 L3
TEMPERATURES
OUTDOOR-AIR TEMPERATURE F DB (Dry Bulb)
RETURN-AIR TEMPERATURE
FDB F WB(WetBulb)
COOLING SUPPLY AIR
F
GAS HEAT SUPPLY AIR (48PG)
F
ELECTRIC HEAT SUPPLY AIR (50PG)
F
PRESSURES
GAS INLET PRESSURE IN. WG
GAS MANIFOL D PRES S URE STAGE NO. 1
IN. WG STAGE NO. 2 IN. WG
REFRIGERANT SUCTION CIRCUIT A
PSIG
CIRCUIT B PSIG
CIRCUIT C
PSIG
REFRIGE RANT DISCHARGE CIRCUIT A
PSIG
CIRCUIT B
PSIG
CIRCUIT C
PSIG
j VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS
GENERAL
j ECONOMIZER MINIMUM VENT AND CHANGEOVER SETTINGS TO JOB REQUIREMENTS
48/50PD

Table of Contents

Related product manuals