EasyManua.ls Logo

Carrier 50FC Series - Control Module Communication; Communication Failures

Carrier 50FC Series
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
34
12 - FACTORY OPTIONS AND ACCESSORIES
12.3 - Heat recovery wheel module (BW assembly)
Transport and handling
The module with the rotary heat exchanger and its support bed
are supplied disassembled with the unit, for installation on site.
The module can be handled safely by using a forklift truck. The
base frame features guide rails to accommodate the forks of
the fork-lift truck. These guide rails avoid any slippage.
For transport and lifting up to the roof using a crane, a rocker
arm as well as approved slings must be used. These slings are
attached on the grips tted to the cover of the module.
Installation
The fresh air housing (1) is factory-installed.
First, the front panel (2) is secured using 8x40 hex screws.
Then, in models 100 to 170 the support bed (3) is tted. This
is xed to the panel using 4.8 self-tapping hex screws on the
sides and 8x40 hex screws on the front. The recovery module
is positioned on the support bed but without e orts on it.
Note: On models 180 to 280 there is no such support bed.
Next, the module is coupled to the unit. Do not remove the fork-
lift truck until the module is not secured to the unit.
The module is secured to the unit using 8x40 hex screws. To
do this, the side panels must be removed from the module. The
right-hand panel (front view) is secured using M6 Allen screws,
while the left-hand panel (4) incorporates dual locks.
Note: Check that the locks are not blocked. Open the locks with
a 4 mm Allen key (anticlockwise).
In models 100 to 170, the module is screwed to rest on the
support bed using 8x40 hex screws on both sides.
Finally, raise the hoods (5) and follow the assembly procedure
described in paragraph 12.1.
Note: All the screws required for this assembly are supplied secured
on the module and the support bed.
Electrical connection to be made by the costumer:
Note: see the wiring diagram included with the unit for a more
detailed information about the wiring.
The connection is done trought the left-hand panels (front view).
Initial location of the cables for connection:
50FC unit Wheel module
2
1
2
1
BOX3
BOX5
RT
W59RRT
W59
VRR
BOX6
CTW
W58
The following image shows the droplet eliminator placed:
All the screws required for this assembly are supplied in a bag.
Guide rails for forks
Lifting grips
1
2
3
4
5
5
Self-tapping
hex screws
8x40 hex screws
8x40 hex
screws
8x40
hex
Left-hand
panels
1
7
8
9
9
10
6
5

Other manuals for Carrier 50FC Series

Related product manuals