16
13. INDOOR UNIT INSTALLATION
13-1 PREPARATION STEPS BEFORE INSTALLATION
STEP (1) :Selecting Wall Hole Location
Back right or Back left piping :
In case of passing refrigerant piping lines, electrical cables and condensate drain line behind the unit,
drill a hole of 65mm behind the unit in one of the following locations as per the section :
Right Side or Left Side Piping :
In case of passing refrigerant piping lines, electrical cables and condensate drain line from unit right side
or from unit left side, remove the pipe cover form the side panel.
Size 12K
Size 18K
Size 24K
Right rear side refrigerant
pipe hole ø 65
45