EasyManua.ls Logo

Carrier 53KHET 30-36 - Outdoor Unit Installation; Outdoor Unit Preparation and Wall Mounting

Carrier 53KHET 30-36
54 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
21
2
4
1
3
4
Final Assembly
of wall support
2
4
1
3
4
A
15. OUTDOOR UNIT INSTALLATION
15.1 PREPARATION STEPS BEFORE INSTALLATION
a. Put packed unit as shown.
b. Lift unit from cardboard.
c. Remove service door (item 2) by
removing one screw (item 1).
Detach the cable clamp by
removing one screw.
15.2 WALL INSTALLATION STEPS
Wall Support Parts
SR Part Description Qty
1 Right Side 1
2 Left Side 1
3 Back Angle 1
4 Front & Top Angle 2
5 Nut 8
6 Spring Washer 8
Steps of wall support assembly
(1) Fix back angle (item 3) with right side (item1) and left side (item 2)
by using 2 nuts (item 5) and 2 spring washers (item 6).
(2) Fix front angle (item 4) with right side (item 1) and left side (item 2)
by using 2 nuts (item 5) and 2 spring washers (item 6).
(3) Fix top angle (item 4) with right side (item 1) and left side (item 2)
by using 4 nuts (item 5) and 4 spring washers (item 6).
Important Notes :
(1) Mount spring washer before mounting the nut.
(2) Tighten nut properly with torque wrench with tightening torque 5.7 Nm to have tight match.
(3) Be sure that the final appearance of assembled wall support to be leveled and same as figure.
Fix wall support into the wall
Put unit on the wall support.
Wall Installation
Put outdoor unit on the floor support
Floor Installation
1
2
Detail A
5
6
Floor
Support
Outdoor
Unit
Outdoor
Unit
Wall
Support

Related product manuals