EasyManua.ls Logo

Carrier 58MVP - Fault Code 33: Limit or Flame Roll-out Switch Open

Carrier 58MVP
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
COMBUSTION-AIR AND VENT PIPING
General
Combustion-air and vent pipe, fittings, primers, and solvents must
conform to American National Standards Institute (ANSI) stan-
dards and American Society for Testing and Materials (ASTM)
standards. See Table 5 for approved materials for use in the U.S.A.
See Table 7 for maximum pipe lengths and Fig. 37, 38, 39, 40, and
41 for exterior piping arrangements.
In Canada, construct all combustion-air and vent pipes for this unit
of CSA or ULC listed schedule-40 PVC, PVC-DWV or ABS-
DWV pipe and pipe cement. SDR pipe is NOT approved in
Canada.
NOTE: Furnace combustion-air and vent pipe connections are
sized for 2-in. pipe. Any pipe size change should be made outside
furnace casing in vertical pipe. (See Fig. 33.) This allows proper
drainage of vent condensate.
Combustion-air and vent pipes must terminate together in same
atmospheric pressure zone, either through roof or sidewall (roof
termination preferred), using accessory termination kit.
See Table 6 for required clearances.
Furnace combustion-air and vent pipe connections must be at-
tached as shown in Fig. 34. Combustion-air intake plug fitting and
inducer housing alternate vent cap may need to be relocated in
some applications.
NOTE: Slope combustion-air and vent pipes a minimum of 1/4
in. per linear ft with no sags between hangers.
When combustion-air pipe is installed above a suspended
ceiling, pipe must be insulated with 3/8-in. thick Armaflex-
type insulation. Combustion-air pipe should also be insulated
when it passes through a warm, humid space.
When vent pipe is exposed to temperatures below freezing,
such as when it passes through an unheated space or when a
chimney is used as a raceway, pipe must be insulated as
shown in Table 8 with Armaflex-type insulation. Failure to
follow this caution will result in minor unit operation.
Fig. 32—Control Center
A02278
FLASH
UPGRADE
CONNECTOR
(FACTORY
ONLY)
ACRDJ – AIR
CONDITIONING
RELAY DISABLE
JUMPER
HUMIDIFIER
TERMINAL (24-VAC
0.5 AMP MAX.
CONTINUOUS FAN
(CF) AIRFLOW
SETUP SWITCHES
COMMUNICATION
CONNECTOR
AIR CONDITIONING
(A/C) AIRFLOW
SETUP SWITCHES
MODEL PLUG
CONNECTOR
SW1 SETUP
SWITCHES AND
BLOWER OFF-
DELAY
STATUS AND COMM
LED LIGHTS
3-AMP FUSE
TRANSFORMER 24-VAC
CONNECTIONS
PL3 – ECM BLOWER
HARNESS
CONNECTOR
PL1 – LOW VOLTAGE MAIN
HARNESS CONNECTOR
EAC-1 TERMINAL
(
115-VAC 1.0 AMP MAX.
)
115-VAC (L1) LINE
VOLTAGE CONNECTIONS
115-VAC (L2) NEUTRAL
CONNECTIONS
PL2 – HOT SURFACE
IGNITER & INDUCER
MOTOR CONNECTOR
24-V THERMOSTAT
TERMINALS
FUTURE
APPLICATIONS
24

Table of Contents

Other manuals for Carrier 58MVP

Related product manuals