Loading...
59SC2A
Roof
Termination
(Preferred)
Note:
36~in.
separation
between
pairs
of
inlets
only
required
Note:
for
direct-vent
systems
“A"
denotes
0
To
2 in.
(61mm)
Between
the
first
2
vents
Third
vent
{and
fourth
vent,
if
used)
must
be 36
in.
Away
@14mm)
Vertical
separation
between
combustion
air
and
vent
8
%
in.
(222mm)
for
3
in.(76mm)
6
%
in.
(172mm)
for
2in.
1mm)...
(487
Maintain
12
in.
(305mm)
min.
Clearance
above
highest
anticipated
snow
level
maximum
of
24
in.
(614mm)
above
roof
least
36
in.
4
(914mm)
o
Maintain
12
in.
(05mm)
\
min.
Clearance
above
highest
anticipated
snow
level
maximum
of
24
in.
(614mm)
above
roof
}
Concentric
Vent
and
Combustion
Air
a
\
Hl
Roof
Termination
(preferred)
1
in,
(25mm)
maximum
ol
K
\
\
(Typ.)
from
wail
to
inlet
Abandoned
masonry
used
as
raceway
(per
code)
12
in.
From
Overhang
orroof
(Typ.)
Concentric
Vent
and
Combustion
Air
Side
Termination
Maintain
12
in.
(805mm)
min.
Clear
ance
above
highest
anticipated
snow
level
or
grade
whichever
is
greater
(yp)
Side
wail
termination
of
less
than
12
in.
(805mm)
above
highest
snow
level
12
in.
Min
from
overhang
or
_
Note:
Atleast
36
in.
“A”
denotes
0
To
2 in.
(Simm)
(g14mm)
Between
the
first
2
venis
Third
“42
in.
(805mm)
separation
vent
(and
fourth
vent,
fused)
must
between
bottom
of
com-
be
36
in.
Away
(914mm)
bustion
air
and
bottom
of
At
least 36
in.
vent
(Typ.}
(914mm)
Maintain
12
in.
(805mm)
min.
Clearance
above
highest
an—
ticipated
snow
level
or
grade
whichever
is
greater
(Typ.)
L12F044
Fig.
47
-
Combustion
Air
and
Vent
Pipe
Termination
for
Direct
Vent
(2-Pipe)
System
Roof
Termination
(Preferred)
er
vent
Maintain
12
in
(305mm)
minimum
clearance
above
highest
anticipated
snow
fevel
maximum
of
24
in.
(610mm)
above
roof
Abandoned
masonry
used
as
raceway
(per
code)
12
in.
min,
(805
mm}irom
overhang
or
roof
6 in.
(152mm)
minimum
clearance
between
wall
and end
of
vent
pipe.
10
in.
(254mm)
maximum
pipe
lengh
SS
Maintain
12
in.
05mm)
rainimum
clearance
a
+ .
above
highest
anticipate
12
in.
(805
mm)
min.
from
snow
level
or
grade
overhang
or
roof
whichever
is
greater
Sidewall
Termination
with
Straight
Pipe
(preferred)
Maintain
12
in.
(05mm)
minimum
clearance
above
highest
anticipated
snow
level
or
grade
whichever
is
greater.
Side
wall
termination
with
2
elbows
(preferred)
A05091
Fig.
48
-
Vent
Pipe
Termination
for
Non-Direct
Vent
and
Ventilated
Combustion
Air
System