EasyManua.ls Logo

Carrier Aero 39MN Series - Start-Up Checklist; Gas-Fired Furnace Rack Assembly

Carrier Aero 39MN Series
272 pages
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Catalog No. 04-53390024-01 Printed in U.S.A. Form 39M-21SI Rev. B Pg CL-6 8-2020 Replaces: 39M-20SI
© 2020 Carrier
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - -
CUT ALONG DOTTED LINE CUT ALONG DOTTED LINE
START-UP CHECKLIST — CARRIER 39M GAS-FIRED FURNACE RACK ASSEMBLY
I. PRELIMINARY INFORMATION
FURNACE SERIAL NO(S). __________________________________
CARRIER MODEL NO. _____________________________________
SERIAL NO. ______________________________________________
START-UP DATE __________________________________________
START-UP CONTRACTOR __________________________________
TECHNICIAN NAME _______________________________________
PHONE __
_______________________________________________
TYPE
OF GAS ___________________________________________
GAS PRESSURE AT INLET (BURNERS OFF) ____________________________________________________________ in. wg
SUPPLY VOLTAGE AT JUNCTION BOX ___________________________________________________________________ vac
II. OPERATING SET-UP
III. OPERATION CHECKLIST
All gas lines and connections checked for leaks (Pg 189) (Y/
N) _____
Adequate combustion air (Pg 188) (Y/N) _____
Condensate drain lines installed (Pg 187) (Y/N) _____
Any system deficiencies noted (Y/N) _____
DESCRIBE:
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
SIGNATURE:_______________________________________________________ DATE:_______________________________
NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere to
the safety considerations/information as outlined in preceding sec-
tions of this Installation Instruction document.
SINGLE UNIT
2 RACKED FURNACES IN
SERIES SECONDARY
SYSTEM
OPERATING SET-UP DATA LOW FIRE (0V DC) HIGH FIRE (10V DC) HIGH FIRE (10V DC)
Gas Press. at Supply Inlet ___________in. wg ___________in. wg ___________in. wg
Gas Input Rate ____________Btuh ____________Btuh ____________Btuh
Measurements at Common Header Discharge
CO
2
in Flue Gas _______________% _______________% _______________%
CO in Flue Gas _____________ppm _____________ppm _____________ppm
Flue Gas Temp at Discharge __
____________°F ______________°F ______________°F
Temperature Rise ______________°F ______________°F ______________°F

Table of Contents

Related product manuals