AFTER INSTALLATION CHECK LIST
5.6 FINISHING INSTALLATION
a. The refrigerant piping lines, electrical cables and condensate drain hose
are lumped together. The drain hose is at the bottom of the lump.
b. The wall passage hole is properly sealed.
a. The cooling cycle is tested
At least one complete cooling cycle of unit operation is observed.
ormal noise or vibration from the outdoor unit during operation.
c. There is no any abnormal noise or vibration from the indoor unit during operation.
d. The wired controller operates correctly
a. The correct operation of the air conditioner has been explained to the customer
including the following points:
x Starting and stopping method
x Operation mode adjustment
x Other control functions of wired controller
x Filter removal and cleaning and replacement
b. The owner’s and installation manuals have been given to the customer.