EasyManua.ls Logo

Carrier Integra 50X - Evaporator Mounting Preparation - Mushroom Installation

Carrier Integra 50X
30 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation & Commissioning Manual:
Neos 100S, 20X, 30S, 35X, 40X, 50X
62-11165 Rev D
®
10
Evaporator Mounting Preparation Mushroom Installation
Measure the roof depth from the outside of the roof to the inside
of the inner box skin (distance “L”).
L
L
Measure mushrooms from the bottom of the head
to end of the mushroom. Mark and cut them to the
same length “L”. Apply waterproof silicone caulk to
the underside of the mushroom head and tap into
the vehicle roof to slightly crush the caulk. Bolt the
evaporator in place using the hardware supplied.
1
2 3
4
5
6
7
8
The correct bolting arrangement is show with the mushrooms
and evaporator in place. Note that the evaporator should not
press directly against the mushrooms due to the step drilling.
1) Mushroom (34-01262-00)
2) Silicone caulk
3) Vehicle roof
4) Box insulation
5) Inner box skin
6) Evaporator housing
7) Washer
8) Mounting screw

Related product manuals