EasyManua.ls Logo

Carrier KGATW0601HSI - Page 35

Carrier KGATW0601HSI
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Position blower off delay switches on controls in BOTH furnaces to the SAME desired blower off delay in heating. See furnace Installation,
Start-Up, and Operating Instruction for further details.
3. Attach twinning connection wiring label above the existing furnace wiring label on the inside of the L/H furnace blower access door. Use
the following labels for the following applications:
Single Stage furnaces with single stage thermostat, 327893–101
Single Stage furnaces with two-stage thermostat, 327892–101
Two Stage furnaces with single stage or 2–stage thermostat, 327891–101
Fig. 33—Concentric Vent and Combustion-Air Roof Termination (Dimension “A” is Touching or 2-in. Maximum Separation)
A93056
COMBUSTION
AIR
VENT
VENT
A
Fig. 34—Concentric Vent and Combustion-Air Side Termination (Dimension “A” is Touching or 2-in. Maximum Separation)
A93057
COMBUSTION AIR
VENT
A
VENT
1MAXIMUM
(TYP)
Fig. 35—Sidewall Termination of 12 in. or Less (Dimension “A” is Touching or 2-in. Maximum Separation)
A96129
A
COMBUSTION AIR
COMBUSTION AIR
VENT
—35—