EasyManua.ls Logo

Carrier XCT 7 40VU005~018C-7S-QEE - Installation Procedures; Drainpipe Lifting and Confirmation

Carrier XCT 7 40VU005~018C-7S-QEE
160 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
19
Installation Procedures
The drainpipe can be lifted 360 mm.
After the drainage pipe has been lifted, it must
be installed with a downward slope.
The drainage should be checked during the test run to ensure that there is no
leakage in the connection.
Fill water from the outlet or the specied position and check the drainage.
Fill 600 cc water using a hose from the outlet or the specied location on the
machine. Add the water slowly. Don’t add water to the motor of the drainage pump.
After mounting the electrical system, ensure that cooling occurs adequately and
also introduce water into the system for checking.
• If the electrical installation hasn’t been completed, pull out the terminal (2P) of the
oater switch on the electrical cabinet. After conrming the drainage, connect the
terminal of the oater switch, and run the drainage pump for 5 minutes until it
stops automatically.
• Conrm the sound of the motor:
Conrm the sound of the motor of the drainage pump, and meanwhile check the
drainage.
Lifting drainpipe
Conrming drainage
hose
hose clamp
attached heat
insulating material
heat insulating
material
PVC pipe
100mm
below
under the ceiling
joint of drainpipe
lifting 600mm below
lifting
360mm below

Related product manuals