EasyManua.ls Logo

Carrier ZS Standard - Mounting Location; To Wire and Mount the PAT Sensor

Carrier ZS Standard
75 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Primary Air Temperature sensor
Carrier Sensors CARRIER CORPORATION ©2021
Installation Guide All rights reserved
41
Mounting location
Mount the sensor in the top or side of the supply duct.
Drill hole in top of duct
and let sensor hang down
Alternate location
inside of duct
Supply duct
To wire and mount the PAT sensor
1 Drill or punch a .5 inch (1.3 cm) hole in the duct.
2 Connect a .5 inch (1.3 cm) nominal field-supplied conduit between the zone controller enclosure and the
junction box.
3 Pass the sensor wires through the conduit.
4 Insert the sensor's probe into the hole.
5 Secure the sensor to the duct using the 2 mounting screws provided.
CAUTION The tip of the sensor's 6-inch (15.2-cm) probe must not touch the inside of the duct.
6 Wire the sensor to the Open controller. See the controller's Installation and Startup Guide for details.
Downloaded from ManualsNet.com search engine

Table of Contents

Other manuals for Carrier ZS Standard

Related product manuals