Pg. 11V06232023
A. Attach the Height Adjustment Handle (#15) to the Left Lock Switch (#35) on the Pulley Carriage,
secure it with one M5 x 10 Allen Bolt (#22). Repeat the same procedure to install the other side.
B. Connect the Single Handle (#13) to the Cable (#1) on the Right Station (#1) with a Spring Clip (#17).
Repeat the same procedure to install the other side.
C. Lift up the Height Adjustment Handle (#15) and slide the Pulley Carriage along the Pulley Carriage
Support Frame to the selected level. Release the Handle to lock the Pulley Carriage in position.
D. Store Curl Bar (#12), and Rope (#11) onto the Hanger Bracket behind the Upper Cross Brace (#5).
Hang Chin Up Belt (#14) on Upper Cross Brace (#5).