EasyManua.ls Logo

Chrysler 2000 LHS - Page 1217

Chrysler 2000 LHS
1591 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TRANSMISSION CONTROL RELAY
REMOVAL
(1) Open hood and locate power distribution center
in the engine compartment.
(2) Remove power distribution center plastic cover.
(3) Pull relay out of power distribution center (Fig.
92).
INSTALLATION
(1) To install, reverse removal procedure.
SOLENOID/PRESSURE SWITCH ASSEMBLY
REMOVAL
(1) Raise vehicle on hoist.
(2) Remove valve body assembly from transaxle.
Refer to Valve Body Removal and Installation in this
section for procedure.
(3) Remove Solenoid/Pressure Switch Assembly
retaining screws from solenoid (Fig. 93).
(4) Remove Solenoid/Pressure Switch Assembly
and screen from valve body (Fig. 94).
INSTALLATION
(1) Install Solenoid/Pressure Switch Assembly and
screen to the separator and transfer plates (Fig. 94).
(2) Install and tighten retaining screws (Fig. 93) to
6 N·m (53 in. lbs.) torque.
(3) Install valve body. Refer to Valve Body
Removal and Installation.
VALVE BODY
REMOVAL
(1) Disconnect the TRS wiring connector. The sole-
noid wiring connector can remain attached to the
case.
(2) Disconnect the shift cable from the shift lever
(at the transaxle).
(3) Move the shift lever clockwise as far as it will
go. This should be one position past the L position.
Then remove the shift lever.
(4) Remove transaxle pan bolts (Fig. 95).
Fig. 92 Transmission Control Relay Location
1 TRANSMISSION CONTROL RELAY
2 PDC
3 TCM
Fig. 93 Solenoid Retaining Screws
1 SOLENOID PACK
2 SOLENOID RETAINING SCREWS
Fig. 94 Solenoid/Pressure Switch Assembly and
Screen
1 SOLENOID PACK
2 VALVE BODY
3 SCREEN
21 - 48 42LE TRANSAXLE LH
REMOVAL AND INSTALLATION (Continued)

Table of Contents

Related product manuals