EasyManua.ls Logo

Cisco Nexus 2000 Series - Page 132

Cisco Nexus 2000 Series
190 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-12
Cisco Nexus 2000 Series Hardware Installation Guide
Chapter 4 Installing a Cisco Nexus Fabric Extender
Grounding the System
Figure 4-2 Cisco Nexus 2300 Series FEX Ground Lug Location
In addition, follow these guidelines when handling these devices:
Handle carriers by available handles or edges only; avoid touching the printed circuit boards or
connectors.
Place a removed component board-side-up on an antistatic surface or in a static-shielding container.
If you plan to return the component to the factory, immediately place it in a static-shielding
container.
Never attempt to remove the printed circuit board from the metal carrier.
Caution For safety, periodically check the resistance value of the antistatic strap. The measurement should be
between 1 and 10 megohm (Mohm).
1 ESD ground strap 4 Clip installed (behind screw)
2 Clip and grounding lug 5 Ground Lug
3 Side view of grounding lug (clip slid behind
screw)

Table of Contents

Other manuals for Cisco Nexus 2000 Series

Related product manuals