EasyManua.ls Logo

Cisco Nexus 9508 - Page 119

Cisco Nexus 9508
152 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2
Turn the power supply 90 degrees so that the release lever is on the upper right front end of the module. Position
and orient the other end of the module at the open power supply slot in the chassis.
3
Slide the handle on the middle of the release lever towards the end of the lever and rotate the lever away from
the front of the power supply while pushing the power supply all the way into the slot (see the following figure).
Rotate the lever towards the front of the module.4Slide and hold the middle handle next to the outer
handle.
1
Make sure that the other end of the lever grabs the
front of the chassis to push the module onto the
connectors inside the slot.
5Fully rotate the release lever away from the front
of the module.
2
Slide the power supply into the open power supply
slot in the chassis until it stops with the front of
the module about 0.25 inches (0.6 cm) in front of
the chassis.
3
4
Slide the power supply gently into the slot until it stops with the front of the module even with the front of the
chassis.
Cisco Nexus 9508 NX-OS Mode Switch Hardware Installation Guide
109
Replacing or Installing Modules, Fan Trays, and Power Supplies
Installing or Replacing a 3-kW DC Power Supply

Table of Contents

Related product manuals