EasyManua.ls Logo

Cisco ONS 15454 ETSI - Page 38

Cisco ONS 15454 ETSI
88 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1-38
Cisco ONS 15454 DWDM Procedure Guide, R8.0
78-17704-02
Chapter 1 Install the Shelf and Common Control Cards
NTP- G18 Connect Office Power to the ONS 15454 ANSI
Note If the system loses power or if both TCC2/TCC2P cards are reset, you must reset the ONS 15454 ETSI
clock. After powering down, the date defaults to January 1, 1970, 00:04:15. To reset the clock, see the
“NTP-G24 Set Up Name, Date, Time, and Contact Information” procedure on page 3-10.
Step 1 Verify that the MIC-A/P FMEC is installed in Slot 23 and the MIC-C/T/P FMEC is installed in Slot 24 of the
EFCA.
Step 2 Attach the connector on the end of the power cable to the power FMEC.
Step 3 Tighten the screws of the connector on the power cable.
Step 4 Connect the power cable to the fuse panel or power source. Use the pin connections in Table 1-1.
Step 5 Return to your originating procedure (NTP).
DLP-G18 Connect Office Power to the ONS 15454 ANSI
Table 1-1 Pin Connection of the Power FMECs
Pin Function Cable Color
A1 Battery return Black
A2 –48 V battery Red
A3 Ground Green with yellow stripes
Purpose This task connects power to the ONS 15454 ANSI shelf.
Tools/Equipment #2 Phillips Dynamometric screwdriver
Medium slot-head screwdriver
Small slot-head screwdriver
Wire wrapper
Wire cutters
Wire strippers
Crimp tool
Fuse panel
Power cable (from fuse and alarm panel to assembly), #10 AWG, copper
conductors, 194 degrees F [90 degrees C])
Ground cable #6 AWG stranded
Listed pressure terminal connectors such as ring and fork types; connectors
must be suitable for #10 AWG copper conductors
Prerequisite Procedures DLP-G16 Connect the Office Ground to the ONS 15454 ANSI, page 1-35
Required/As Needed Required

Related product manuals