EasyManua.ls Logo

CITROEN C3 PLURIEL - Page 122

CITROEN C3 PLURIEL
268 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
116
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: 8HY
B1BP2N0C
Tools.
[1] Engine flywheel peg Ø 12 mm : (-).0194-C
[2] Camshaft pulley peg Ø 8 mm : (-).0194-B
[3] Crankshaft pulley peg Ø 5 mm : (-).0194-A
Preliminary operations.
Remove:
- The front RH wheel.
- The front RH splash-shield.
- The accessories belt
(see corresponding operation)
.
Uncouple:
- The supply unions (1).
- The air/air heat exchanger inlet/outlet pipes (3).
- The exhaust line
(at the flexible pipe)
.
Disconnect the connector (2).
Support the engine by means of a roller jack equipped with a chock.
Remove the engine supports (4) and (5).
C3
Angl.-T1-page 92-134-2005 9/01/06 9:16 Page 116

Table of Contents

Other manuals for CITROEN C3 PLURIEL

Related product manuals