EasyManua.ls Logo

CITROEN C6 2005 - Page 73

CITROEN C6 2005
223 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
67
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: DT17BTED4
Remove tools [2] and [3].
Refit: The lower timing cover (10), the upper timing covers (11), the crankshaft pulley (9), the engine
support (12), the coolant pump pulley (13), the accessories drive belt (8) (see corresponding operation),
the engine support (4) on the chassis member, the upper RH engine support (5) and the upper RH
engine support tie bar.
Take away the workshop hoist.
Remove the tool [6].
Refit the "Swirl" electrovalve (7) with its support, the header tank (1), the electrical harness.
Remove the tool [1].
Reposition and couple the pipes (3) and (2).
Complete the refitting.
B1EP1JHD
B1EP1JJC
Angl-C6-page022-82-2005 4/02/05 17:19 Page 67

Table of Contents

Related product manuals