EasyManua.ls Logo

CITROEN CX Series - Page 132

CITROEN CX Series
390 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
R..
z
z
.5C
.-a
12
OPERATION
MA.I
E:
144-0 :
(hcking Cl(/
(l(//1IsIi1/
Ii. 1-] elroiiic
»
cIccirouic
/11?/ ///f(CIiO)/ SySI(u/.
1.
Energizing
the system :
(
DIAGRAM
1)
NOT
E
ih
donbI r(l cl) is
scciircci ll)/d(r the
L.
II.
headlamp.
Disconnect
the EC U
-
Switch
the
ignition on
- Usinq a voitmeter. ensure
that
erich
point in diagram 1 is
effectively
energized. af ter havirig tested
the
earthing
If not switch off the ignition. and
test the
circuit
using a
battery operated
ohmmeter, With
the
voitmeter connected
between
terminals
(
1)
and (5)
of
the E. CU.
operate
the starter the
voitmeter
must
register the
ignition impulses.
If it does not,
check the
ignition
(
ANN
EXE
A
).
2. Fuel pump
feed
(
on operating
the
starter
)
(
DIAGRAM 2
-
Disconnect
the
E CU.
-
Switch
on the
ignition
-
On operating the
starter. the fuel
pump
(
secured aiider the
iehicle. 1/ear the
R.
Il. rear 11 /eei must be
heard
to
operate by
someone standing
close by
If
not,
switch off the
ignition. and test the
circuit
using a battery
operated ohmmeter.
The resistance
between
terminal
«
88 d
»
of
the relay
assembly
(
under
Ihe
L
fl. headlamp
)
and earth
must be
1
approx.
Make
sure
tIie
petrol
pump
is properly earthed.
PDF compression, OCR, web-optimization with CVISION's PdfCompressor

Table of Contents

Related product manuals