EasyManua.ls Logo

CN 80 - Page 14

Default Icon
21 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 14
CHECK LIST
User manual received
I have received instructions in the use of the boiler,
including what fuel material may be fed to the boiler.
I have received instructions in the maintenance of the boiler
Installation carried out by :_______________________________________________
__________________________________________
Signature
Please check below
The installation was carried out in accordance with the Installation and Assembly Guide in the user
manual and is thus covered by the CN MASKINFABRIK A/S Construction Test
Certificate______________
The installation engineer has subjected the boiler unit to a construction test (module B1) or
installed the boiler unit in accordance with a full quality assurance system (module H) in
accordance with the Pressure Equipment Directive 97/23/EEC
. _____________________
Boiler type :
Serial number:
Year :
I hereby declare that I have understood the received material.
Name: ____________________________________
Address: ____________________________________
Town and post code:__________________________________
____________________________________
Signature
Please return to: CN MASKINFABRIK A/S,
Skovløkkevej 4,
Tiset
6510 Gram,
Denmark
This warranty only comes into force when CN MASKINFABRIK A/S has received this page signed