EasyManua.ls Logo

Coffee Queen HVA - Programming; Manual Water Filling Setup

Coffee Queen HVA
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9.
7. Programming.
1. Programming automatic controls for manual water filling.
1.1. Fill the water to A in the tank up to the long sensor pin.
See fig. 1. Approximately 4 litres.
1.2. Keep button (B) pressed and switch on the machine
with the switch (D) at the same time.
A
fig.1.
fig.2.
B
C
D
1.3. The display shows T1
Change the type of machine with buttons B or C.
1.4. T1 = HVA automat
T2 = HVM manual
1.5. Confirm the choice by holding down the buttons (B) and (C) at the same time
for approximately 5 seconds.
NOTE Install the plug supplied in the inlet valve (E) to avoid possible leakage.
E