PN 410081 REV B Page 1 of 5 7/22/2014
Important: if servicing an S220 produced prior to December 15, 2011, (serial
number less than 1760) it will be necessary to obtain the current SonoLab CD
image from the Covaris website. Instructions are included in the ‘New
Controller Laptop Support’ section below. Obtaining the software requires a
user account which may take a day or more to become active. Make certain
that your user account is active prior to beginning work.
PROCEDURE:
GAINING CIRCUIT BOARD ACCESS
1. Ensure S220 device is turned off and power cord is unplugged. If possible, perform
replacement in an ESD-Safe environment to avoid potential for static discharge damage
on the PCBA.
2. Remove pump cover by unscrewing 4 button-head cap screws with 2mm hex wrench (2
screws on each side of device).
Figure: Pump Cover Location
14 Gill Street, Unit H
Woburn, Massachusetts
01801-1721 USA
+1 781 932 3959
TITLE: Replacing Pre-Programmed Controller or RF Power Boards in a Covaris
S220 Instrument
PURPOSE: Instructions for replacing 220 series
Controller or RF Power Boards which have been
pre-programmed for use in an
NOTE: if installing an UNPROGRAMMED board,
follow instructions in appropriate Covaris Service
• #1 and #2 Phillips Screwdriver
• 2mm Hex Driver / Allen Wrench
•
Appropriate 220 Series Controller
Board or Power Board Repair Kit