EasyManuals Logo

Cressi-sub 2nd Stage Ellipse Balanced User Manual

Cressi-sub 2nd Stage Ellipse Balanced
69 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #10 background imageLoading...
Page #10 background image
Regulators repair and maintenance
January 2009 Rev. ELL.BAL/B Ed. C /12 10
2
nd
stage Ellipse
Balanced
Use a 0,75 in. and a 0,67 in.
spanner to remove the low
pressure hose, holding the lock
nut steady with the former and
unscrewing the hose with the
latter;
By annual replacement it is
necessary to replace the O-
rings inside the hose;
Check the low pressure hose
for visible signs of wear, cuts or
abrasions, especially next to
the threaded connecting parts.
Remove the low pressure hose

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Cressi-sub 2nd Stage Ellipse Balanced and is the answer not in the manual?

Cressi-sub 2nd Stage Ellipse Balanced Specifications

General IconGeneral
BrandCressi-sub
Model2nd Stage Ellipse Balanced
CategoryDiving Instrument
LanguageEnglish

Related product manuals