EasyManuals Logo

Cressi-sub 2nd Stage Ellipse Balanced User Manual

Cressi-sub 2nd Stage Ellipse Balanced
69 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #6 background imageLoading...
Page #6 background image
Regulators repair and maintenance
January 2009 Rev. ELL.BAL/B Ed. C /12 6
2
nd
stage Ellipse
Balanced
Annual replacement
Cressi-Sub recommends complete regulator maintenance at least once a year,
or more frequently in the case of particularly intense use.
Maintenance must include replacement of all components provided in the
annual equipment maintenance kit.
The special tools for maintenance of this equipment are illustrated in a section
of this document on page 8.
Metal parts must be washed with hot water and neutral detergent and rinsed
in fresh water. Any concretions must be removed using ultrasound cleaning or
with diluted acid solutions, always followed by long and thorough rinsing
under running water.
Do not use acids or solvents on rubber components.
The new ORs must be greased with a thin layer of silicon grease: this
procedure reduces to a minimum the risk of damage during assembly.
The metal threading can be lubricated with grease on the first two rings of
threading.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Cressi-sub 2nd Stage Ellipse Balanced and is the answer not in the manual?

Cressi-sub 2nd Stage Ellipse Balanced Specifications

General IconGeneral
BrandCressi-sub
Model2nd Stage Ellipse Balanced
CategoryDiving Instrument
LanguageEnglish

Related product manuals