EasyManuals Logo

Cressi-sub AC10 User Manual

Default Icon
84 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #66 background imageLoading...
Page #66 background image
Setting of 1st stage Setting of 1st stage
AC10AC10
Regulators repair and maintenanceRegulators repair and maintenance
AC10AC10
Assemble the pressure gauge on one of the LP ports of the 1st stage
Assemble
the
pressure
gauge
on
one
of
the
LP
ports
of
the
1st
stage
Place the whole regulator (1st+ 2nd stage) on a 200 bar pressurized tank or on an
equally pressurized test-bed.
Slowly open the air tap while pressing the 2nd stage air discharge button Repeat some
Slowly
open
the
air
tap
while
pressing
the
2nd
stage
air
discharge
button
.
Repeat
some
times.
Check the pressure on the gauge. The 1st stage AC10 is correctly set at a pressure
between 9 8 and 10 bar Should the value be different close the air tap and discharge
between
9
.
8
and
10
bar
.
Should
the
value
be
different
,
close
the
air
tap
and
discharge
the regulator. Insert a 0,23” (6 mm) Allen wrench in the setting screw and screw
clockwise in order to increase the 1st stage intermediate pressure. When screwing
anticlockwise, the
p
ressure will decrease.
p
Note: remember to unload the regulator before setting the intermediate pressure, in
order to avoid incorrect readings of the gauge.
Check the intermediate pressure is quickly reached and remains so, without increasing,
after pressing the 2nd stage discharge button several times.
JanuarJanuar 20072007 Rev. AC10 / 2 Ed. B / 07Rev. AC10 / 2 Ed. B / 07 6666

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Cressi-sub AC10 and is the answer not in the manual?

Cressi-sub AC10 Specifications

General IconGeneral
BrandCressi-sub
ModelAC10
CategoryDiving Instrument
LanguageEnglish

Related product manuals