Do you have a question about the Crown Boiler Mega-Stor and is the answer not in the manual?
Quick method for sizing Mega-Stor based on typical residential applications.
Detailed procedure for sizing Mega-Stor based on fixture counts and demand calculations.
Guides sizing Mega-Stor for commercial buildings using fixture demands and demand factors.
Details on designing the piping and circulator system for the Mega-Stor zone.
Ensures compliance with codes and checks water chemistry before installation.
Guidance on selecting a suitable location, considering weight and potential leaks.
Illustrates various boiler-side piping methods for Mega-Stor integration.
Details on connecting the Mega-Stor to the domestic water supply and fixtures.
Wiring diagram for a non-priority circulator zone system using Honeywell R845A.
Wiring diagram for a priority circulator zone system using Honeywell R8285B.
Wiring diagram for a zone system using Honeywell V8043F motorized zone valves.
Wiring diagram for a priority zone system using Honeywell V8043F valves and R8285B relay.
Wiring diagram for a 3-way zone valve system with priority zoning.
| Category | Water Heater |
|---|---|
| Model Number | Mega-Stor |
| Max Operating Pressure | 150 psi |
| Dimensions | Varies by model |
| Capacity | 40, 80, 119 gallons |
| Insulation | High-density foam |
| Warranty | Limited lifetime warranty |
| Height | Varies by model |
| Diameter | Varies by model |
Loading...