EasyManua.ls Logo

Cryomech PT415 - Page 84

Default Icon
93 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Appendix A
A-8
13) Crank the winch handle to give slack in the steel cable until the loop in the cable reaches the top hole
of the Reliquefier bottom bracket and install the cable retaining bolt as shown.
14) Install the other (2) 5/16”-18 x 1” mounting bolts and nuts being sure to tighten all (4) bolts.

Related product manuals