CR-UCM Series Start-up and Install Check List
Start-up Sequence:
• Turn Water on to unit (conrm ow from faucets)
• Plug unit in and toggle On/O switch to the On posion.
• Turn CO2 on at tank. (carb tank may need to be bled)
Water Filters, CR-24FC and CR-24FCP
• Water On. Filters ushed via the ush valve and owing water.
• Water pressure at/through water lter system above 50 psi and not dropping o.
• All connecons leak free.
• 50 PSI water reducer valve installed aer water lter, poinng in the correct direcon.
CO2
• CO2 hose from unit: are nut connecon on end of CO2 Hose ght to CR-3741 CO2 Regulator
(Be sure to use nylon washer supplied with Reg in ng).
• CO2 Reg connected to CO2 tank (card board/plasc washer used) ght and leak free.
• CO2 Tank Full, Opened all the way and Set to 75 PSI.
CBR tower:
• Faucets ght to shank and posioned vercally. Free of leaks. Customer has faucet wrench.
• Handles ght, front facing and labels are appropriate for water type.
• Sparkling water; cold, carbonated and tastes clean and pure. (Run a few liters of water; is carb pump
cycling on and ow consistent without gassing out).
• Sll Water: cold and consistent ow. Tastes clean and pure.
• Flow adjustment on faucets set and knob ghtened down so ow rate cant change
• Connecons to tower made using supplied Super Seal JG ngs from kit and leak free.
• All exposed Hoses and Fings all wrapped in insulated foam tape.
Remote Chiller: Unit on.
• Unit On and Plugged into a dedicated 120V outlet.
• Cabinet properly venlated to handle BTU load of unit heat. Can fresh air draw in and hot air vent out.
Unit free of obstrucons around it and can vent. If using a Fan box, check that it is plugged in and running.
• Unit posioned so Air Filter is accessible. If using a CR-ABUCM air bae, it is in place and sealing to vents.
• Rear outlet connecons for trunkline (hoses and ngs) to tower wrapped in insulted tape and leak free.
• Water Inlet connecon to unit leak free and not pinched o anywhere
• Water Bath lled with water up to the white stand pipe.
• Ice Bank formed on refrigeraon coils in water bath. Unit cycling on and o properly to maintain ice bank.
Unit will take 2 hours to form full ice bank aer inial start-up.
• Carb pump cycling on for 7-14 seconds aer 1.5 liters of Sparking water is poured, and not screeching.
• Agitator pump agitang bath water and pumping re-circ water through the trunkline.
Notes: