EasyManua.ls Logo

Crysalli CBR Series - Page 2

Crysalli CBR Series
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CR-UCM Series Start-up and Install Check List
Start-up Sequence:
Turn Water on to unit (conrm ow from faucets)
Plug unit in and toggle On/O switch to the On posion.
Turn CO2 on at tank. (carb tank may need to be bled)
Water Filters, CR-24FC and CR-24FCP
Water On. Filters ushed via the ush valve and owing water.
Water pressure at/through water lter system above 50 psi and not dropping o.
All connecons leak free.
50 PSI water reducer valve installed aer water lter, poinng in the correct direcon.
CO2
CO2 hose from unit: are nut connecon on end of CO2 Hose ght to CR-3741 CO2 Regulator
(Be sure to use nylon washer supplied with Reg in ng).
CO2 Reg connected to CO2 tank (card board/plasc washer used) ght and leak free.
CO2 Tank Full, Opened all the way and Set to 75 PSI.
CBR tower:
Faucets ght to shank and posioned vercally. Free of leaks. Customer has faucet wrench.
Handles ght, front facing and labels are appropriate for water type.
Sparkling water; cold, carbonated and tastes clean and pure. (Run a few liters of water; is carb pump
cycling on and ow consistent without gassing out).
Sll Water: cold and consistent ow. Tastes clean and pure.
Flow adjustment on faucets set and knob ghtened down so ow rate cant change
Connecons to tower made using supplied Super Seal JG ngs from kit and leak free.
All exposed Hoses and Fings all wrapped in insulated foam tape.
Remote Chiller: Unit on.
Unit On and Plugged into a dedicated 120V outlet.
Cabinet properly venlated to handle BTU load of unit heat. Can fresh air draw in and hot air vent out.
Unit free of obstrucons around it and can vent. If using a Fan box, check that it is plugged in and running.
Unit posioned so Air Filter is accessible. If using a CR-ABUCM air bae, it is in place and sealing to vents.
Rear outlet connecons for trunkline (hoses and ngs) to tower wrapped in insulted tape and leak free.
Water Inlet connecon to unit leak free and not pinched o anywhere
Water Bath lled with water up to the white stand pipe.
Ice Bank formed on refrigeraon coils in water bath. Unit cycling on and o properly to maintain ice bank.
Unit will take 2 hours to form full ice bank aer inial start-up.
Carb pump cycling on for 7-14 seconds aer 1.5 liters of Sparking water is poured, and not screeching.
Agitator pump agitang bath water and pumping re-circ water through the trunkline.
Notes:

Related product manuals