Crysalli Beverage Systems a division of WPD
1739 Sabre Street, Hayward, CA 94545
www.crysalli.com 510.732.0100
Countertop Series
Start-up and Install
Check List
Start-up Sequence:
☐ Confirm the water bath is filled
☐ Turn water on to unit (confirm
flow from faucets)
☐ Plug unit in and toggle on/o
switch to the on position.
☐ Turn CO2 on at tank (carb tank
may need to be bled).
Water Filters, CR-24FC and
CR-24FCP:
☐ Water on. Filters flushed via the
flush valve and flowing water.
☐ Water pressure at/through
water filter system above 50 PSI
and not dropping o.
☐ All connections leak-free.
CO2:
☐ CO2 hose from unit: flare nut
connection on end of CO2
hose tight to CR-PC160 CO2
Regulator (be sure to use nylon
washer supplied with reg in
fitting).
☐ CO2 reg connected to CO2 tank
(card board/plastic washer
used) tight and leak-free.
☐ CO2 tank full, opened all the
way and set to 75 PSI.
Countertop Chiller:
☐ Faucets tight and positioned vertically. Handles tight and positioned
front facing.
☐ Water bath filled with water up to the top of the WHITE stand pipe.
☐ Unit on and plugged into a dedicated 120V outlet.
☐ Ice bank formed/forming on refrigeration coils in water bath. Unit
cycling on and o properly to maintain ice bank. Unit will take 2 hours
to form full ice bank aer initial start-up.
☐ Sparkling water; cold, carbonated. Tastes clean and pure. Adjust flow
control on faucet to slow flow rate.
☐ Run a few liters of sparkling water, is carb pump cycling on and flow
consistent without gassing out. Carb pump will cycle on aer 1.5 liters
of sparking water is poured. Carb pump should run for 7-14 seconds.
☐ Still water: cold and consistent flow. Tastes clean and pure. Adjust flow
control on faucet to needs.
☐ Check clearances; Unit should be able to ventilate hot air out sides
and breath fresh air in the back. Unit free of obstructions around it and
can vent.
☐ Air filter in rear of machine is accessible
☐ Water inlet connection to unit leak free and not pinched o anywhere
☐ Agitator pump agitating bath water.