2
WARNING TO AVOID SCALDING, Do not remove brewcone while brew light is ashing.
1. Brewer should be ON (Conrm at rear toggle switch, then press the ON/OFF button). Ready-to-Brew should be on the display.
2. Place an empty airpot under the brewcone.
5. Press the brew button.
Coffee will start to brew
into the airpot.
4. Slide the lled brewcone
into the brew rails on the
brewer.
3. Place a clean lter
into the brewcone. Fill
brewcone with the proper
amount of ground coffee.
Coffee Brewing Instructions
Your Curtis G3/Gold Cup Series is Factory Pre-Set for Optimum Performance.
After connection to water and power; the rear toggle switch must be on. You will hear a beep sound, indicating power is available to the controller.
The control displays . Press ON/OFF button and the screen will display . After three seconds, is displayed.
Water will ll the tank (approximately 2-3 minutes depending on water ow rate). When the proper level is reached will appear on the screen.
It takes approximately 20 minutes to reach the set point temperature.
Control will display when temperature reaches the set point. The unit is now ready to brew.
<MODEL>
CURTIS
CURTIS
CURTIS
READY TO BREW
CURTIS
FILLING
CURTIS
HEATING
Programming with the Universal Control Module (UCM)
Turn off the control panel by pressing ON/OFF button. Press and hold bottom/right coffee brew button (#4 in illustration) and then press and release the ON/OFF button.
Continue holding the bottom-right brew button. The screen will display , wait until is displayed. Enter the 4-digit access code, the code corresponds to
the buttons illustrated below. The default code set at the factory is 1-2-3-4.
After the 4-digit code is entered, will be displayed. You can now enter the program menu features.
ENTER CODE
– – – –
PROGRAM MENUS
< SELECT >
ENTERING
PROGRAM MODE
All programming selections are performed with the three center buttons.
The symbols near the buttons are:
Scroll LEFT
SELECTION or ENTER to save new parameter
Scroll RIGHT