EasyManua.ls Logo

DAF CF85 Series - 4.1 REMOVAL AND INSTALLATION, ENTIRE DAF ENGINE PTO ON FLYWHEEL HOUSING

DAF CF85 Series
504 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
CF65/75/85 series Removal and installation
PTO
4-1
4. REMOVAL AND INSTALLATION
4.1 REMOVAL AND INSTALLATION, ENTIRE DAF ENGINE PTO ON FLYWHEEL
HOUSING
Removing entire DAF engine PTO on
flywheel housing
1. If necessary, remove the prop shaft from the
PTO flange.
2. Remove the banjo bolts from the
engine PTO oil pipes.
3. If necessary, remove the electrical and air
connections of the engine PTO.
4. Remove the attachment bolts of the entire
PTO on the flywheel housing.
5. Remove the entire PTO from the flywheel
housing.
6. Remove the PTO centring ring dowel pins
from the flywheel housing.
Installing entire DAF engine PTO on flywheel
housing
1. Fit the PTO centring ring dowel pins in the
flywheel housing.
2. Install the entire PTO on the flywheel
housing.
3. Fit the attachment bolts and tighten them to
the specified torque. See Technical data.
4. Install the oil pipes and banjo bolts and
tighten them to the specified torque. See
Technical data.
5. If necessary, fit the electrical and air
connections of the engine PTO.
6. If necessary, fit the prop shaft on the
PTO flange.
7. Check the PTO operation.
13
200337
https://www.truck-manuals.net/

Other manuals for DAF CF85 Series

Related product manuals