7 | Unit installation
Installer reference guide
54
EVLQ05+08CA + EHYHBH05A + EHYHBH/X08A + EHYKOMB33AA
Daikin Altherma hybrid heat pump
4P355634-1G – 2022.09
7.2.4 To open the gas boiler
1 Open the display cover.
2 Unscrew both screws.
3 Tilt the front panel towards you and remove the front panel.
7.2.5 To open the switch box cover of the gas boiler
1 Open the gas boiler, see "7.2.4To open the gas boiler"[454].
2 Pull the boiler controller unit forwards. The boiler controller will tip
downwards to provide access.