EasyManua.ls Logo

Daikin Altherma EHYKOMB33AA - Commissioning; Overview: Commissioning

Daikin Altherma EHYKOMB33AA
264 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12 | Commissioning
Installer reference guide
194
EVLQ05+08CA + EHYHBH05A + EHYHBH/X08A + EHYKOMB33AA
Daikin Altherma hybrid heat pump
4P355634-1G – 2022.09
12 Commissioning
INFORMATION
Protective functions "Installer-on-site mode". The software is equipped with
protective functions, such as room antifrost. The unit automatically runs these
functions when necessary. (If the user interface home pages are off, the unit will not
operate automatically.)
During installation or service this behaviour is undesired. Therefore, the protective
functions can be disabled:
At first power-on: The protective functions are disabled by default. After 36 h
they will be automatically enabled.
Afterwards: An installer can manually disable the protective functions by setting
[4‑0E]=1. After his work is done, he can enable the protective functions by setting
[4‑0E]=0.
Especially for UK:
It is a requirement that the boiler is installed and commissioned to the
manufacturer’s instructions and the data fields on the commissioning checklist
completed in full.
To instigate the boiler guarantee the boiler needs to be registered with the
manufacturer within one month of the installation.
To maintain the boiler guarantee it is essential that the boiler is serviced annually
by a Gas Safe registered engineer who has been trained on the boiler installed. The
service details should be recorded on Service Interval Record and left with the
householder.
In this chapter
12.1 Overview: Commissioning ...................................................................................................................................................... 194
12.2 Precautions when commissioning.......................................................................................................................................... 195
12.3 Checklist before commissioning............................................................................................................................................. 195
12.4 Checklist during commissioning............................................................................................................................................. 196
12.4.1 To check the minimum flow rate ........................................................................................................................... 197
12.4.2 Air purge function .................................................................................................................................................. 197
12.4.3 To perform a test run ............................................................................................................................................. 199
12.4.4 To perform an actuator test run ............................................................................................................................ 200
12.4.5 Underfloor heating screed dryout ......................................................................................................................... 201
12.4.6 To perform a gas pressure test .............................................................................................................................. 204
12.4.7 To perform a test run on the gas boiler ................................................................................................................ 204
12.1 Overview: Commissioning
This chapter describes what you have to do and know to commission the system
after it is installed and configured.

Table of Contents

Other manuals for Daikin Altherma EHYKOMB33AA

Related product manuals