EasyManua.ls Logo

Daikin Altherma EHYKOMB33AA - To Fix the Fluorinated Greenhouse Gases Label; Preparing Water Piping; Water Circuit Requirements

Daikin Altherma EHYKOMB33AA
264 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8 | Piping installation
Installer reference guide
96
EVLQ05+08CA + EHYHBH05A + EHYHBH/X08A + EHYKOMB33AA
Daikin Altherma hybrid heat pump
4P355634-1G – 2022.09
1 Connect the refrigerant cylinder to the service port.
2 Charge the additional refrigerant amount.
3 Open the gas stop valve.
If pump down is needed in case of dismantling or relocating the system, see
"16.2To pump down"[4232] for more details.
8.4.6 To fix the fluorinated greenhouse gases label
1 Fill in the label as follows:
b
Contains fluorinated greenhouse gases
2
1
1
1
2
2
kg
tCO
2
eq
GWP × kg
1000
=
=
+
kg
=
kg
=
GWP: XXX
RXXX
a
f
c
d
e
a If a multilingual fluorinated greenhouse gases label is delivered with the unit (see
accessories), peel off the applicable language and stick it on top of a.
b Factory refrigerant charge: see unit name plate
c Additional refrigerant amount charged
d Total refrigerant charge
e Quantity of fluorinated greenhouse gases of the total refrigerant charge
expressed as tonnes CO
2
equivalent.
f GWP = Global Warming Potential
NOTICE
Applicable legislation on fluorinated greenhouse gases requires that the refrigerant
charge of the unit is indicated both in weight and CO
2
equivalent.
Formula to calculate the quantity in CO
2
equivalent tonnes: GWP value of the
refrigerant × total refrigerant charge [in kg] / 1000
Use the GWP value mentioned on the refrigerant charge label.
2 Fix the label on the inside of the outdoor unit near the gas and liquid stop
valves.
8.5 Preparing water piping
8.5.1 Water circuit requirements
INFORMATION
Also read the precautions and requirements in the "3 General safety
precautions"[412].
NOTICE
In case of plastic pipes, make sure they are fully oxygen diffusion tight according to
DIN4726. The diffusion of oxygen into the piping can lead to excessive corrosion.
Connecting piping Legislation. Make all piping connections in accordance with
the applicable legislation and the instructions in the "Installation" chapter,
respecting the water inlet and outlet.
Connecting piping Force. Do NOT use excessive force when connecting the
piping. Deformation of the piping can cause malfunctioning of the unit.

Table of Contents

Other manuals for Daikin Altherma EHYKOMB33AA

Related product manuals