EasyManua.ls Logo

Daikin EWAT050CZN-A2 User Manual

Daikin EWAT050CZN-A2
30 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
REV 00
Date 04/2021
Supersedes /
Installation, Maintenance and Operation Manual
DEIMHP0140521_00EN
Air to water heat pump units with scroll compressors
EWYT~CZ / EWAT~CZ

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Daikin EWAT050CZN-A2 and is the answer not in the manual?

Daikin EWAT050CZN-A2 Specifications

General IconGeneral
BrandDaikin
ModelEWAT050CZN-A2
CategoryHeat Pump
LanguageEnglish

Summary

1. Introduction

1.1. Precautions Against Residual Risks

Safety precautions and general risks to avoid during installation and operation of the unit.

1.4. Installation Information

Guidelines for unit placement, ventilation, and compliance with local/international standards for R32.

4. Mechanical Installation

4.1. Safety

Essential safety measures and personnel qualifications required before and during mechanical installation.

4.2. Handling and Lifting

Instructions for safe handling, lifting, and transportation of the unit using appropriate equipment.

4.2.1. Lifting the MONO Unit

Specific instructions for safely lifting single-circuit (MONO) units.

4.2.2. Lifting the DUAL Unit

Specific instructions for safely lifting dual-circuit (DUAL) units.

4.3. Positioning and Assembly

Guidelines for selecting installation sites, foundations, and ensuring proper leveling of the unit.

4.4. Minimum Space Requirements

Required clearances around the unit for adequate ventilation and accessibility for maintenance.

4.7. Water Circuit for Connection with the Unit

Requirements for connecting the unit to the water system, including piping and components.

4.11. Operation Limits

Charts showing cooling and heating operating ranges based on ambient and leaving water temperatures.

5. Electrical Installation

5.2. Electric Connections

Instructions for connecting power supply, ensuring correct phase sequence, and using appropriate cables.

6. Operator's Responsibilities

7. Maintenance

9. Checks for the First Startup

10. Important Information on the Refrigerant Used

Related product manuals