ESIE05-04 Disassembly and Maintenance
Part 5 – Disassembly and Maintenance 5–33
3
5
1
5
1.11.7 Removal of PC Board
Warning Be sure to wait 10 minutes or more after turning off all power supplies before disassembling work.
Procedure:
Step
Procedure Points
Q Remove the switch box
according to the procedure
for removing the switch box.
1
Remove 2 switch box
mounting screws to
open the box.
1 Disconnect the control PC
board.
1
Disconnect the 2
connectors between the
power supply and
control PC boards, then
draw the control PC
board out in the
direction shown by the
arrow.
2 Disconnect the inverter PC
board.
1
Disconnect the harness
from the 2 tabs
provided in the box.
2
Draw the inverter PC
board out in the
direction shown by the
arrow.
Tabs