EasyManua.ls Logo

Daikin FFQ25BV1B - Not Malfunction of the Air Conditioner

Daikin FFQ25BV1B
23 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
English 13
CAUTION
Drain piping connections
Do not connect the drain piping directly to sewage pipes that smell of ammonia. The ammonia in the sewage
might enter the indoor unit through the drain pipes and corrode the heat exchanger.
Drain pipe
Service drain outlet (with rubber plug)
(Use this outlet to drain water from
the drain pan)
Plastic container
for pouring
(Tube should be
about 100 mm long.)
100
<Adding water through air outlet>
[Method of adding water]
Fig. 23
(mm)
1
23
Single phase
power supply
(50Hz 220-240V)
No.1 No.2
No.3
Power supply
terminal block
Fig. 24
Control
box lid
Remove the
control box lid
(take off 2 screws)

Other manuals for Daikin FFQ25BV1B

Related product manuals