EasyManua.ls Logo

Daikin FTXA20AW - Page 131

Daikin FTXA20AW
192 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2 | Components
Service manual
131
FTXA20~50A(W)(S)(T) + FTXA20~50B(B)(S)(T) + RXA42+50A +
RXA20~35A(9) + RXA42+50B
Split Stylish R32
ESIE18-03D – 2021.05
7 To install the switch box, see "2.14Plate work"[4120].
To install the switch box
1 install the switch box in the correct location on the indoor unit.
b a
c
d
e
f
a Grouding wire cover screw
b Grounding wire screw
c Heat exchanger thermistor
d Indoor unit PCB
e Switch box screw
f Switch box
2 Route the connectors of the indoor unit fan motor and front wiring inside the
switch box and connect them to the indoor unit PCB.
3 Install and tighten the screw to secure the switch box.
4 Install the heat exchanger thermistor in its holder.
5 Connect the grounding wire to the heat exchanger using the screw.
6 Install the grounding wire cover using the screw.
7 Connect the power supply wiring to the power supply terminal X1M.
To re-install the front grille
1 Install the front grille and firmly engage the 3 upper hooks.
2 Tighten the 2 screws and put the 2 screw covers back.
3 Re-install the flap.
4 Insert the wire harness back into the connector and secure it with the wire
clamp.
5 Close the front panel. Refer to "To close the front panel"[4131].
To close the front panel
1 Set the filters as they were.
2 Lift the front panel slightly and remove the support from the fixing tab.
a
b
c
a Backside of the front panel

Table of Contents

Related product manuals