EasyManua.ls Logo

Daikin FTXA20AW - Reactor; Checking Procedures

Daikin FTXA20AW
192 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2 | Components
Service manual
132
FTXA20~50A(W)(S)(T) + FTXA20~50B(B)(S)(T) + RXA42+50A +
RXA20~35A(9) + RXA42+50B
Split Stylish R32
ESIE18-03D – 2021.05
b Fixing tab
c Support
3 Close the front panel.
4 Gently press the front panel down until it clicks.
2.15 Reactor
2.15.1 Checking procedures
To perform an electrical check of the reactor
Prerequisite: Stop the unit operation via the user interface.
Prerequisite: Turn OFF the respective circuit breaker.
1 Remove the required plate work, see "2.14Plate work"[4120].
DANGER: RISK OF ELECTROCUTION
Wait for at least 10 minutes after the circuit breaker has been turned OFF, to be sure
the rectifier voltage is below 10VDC before proceeding.
2 Visually check the reactor for any damage or burnt‑out components. If any
damage is found, replace the reactor, see "2.15.2Repair procedures"[4136].
Class 20~35 units
1 Check that the reactors are firmly installed on the main PCB.
a
a
a Reactor
2 Remove the main PCB, see "Repair procedures"[498]. The reactor measuring
points are ONLY reachable on the back side of the main PCB.
3 Measure the resistance of the reactor using a low ohm multi meter.
Result: The resistance MUST be as follows:
Measuring points Resistance
c 24~36mΩ

Table of Contents

Related product manuals