6 | Unit installation
Installer reference guide
27
CTXA15+FTXA25~50(A)(B)2V1B(W)(S)(T)(B)
Daikin room air conditioner
4P518023-3K – 2022.05
a Screw
b Electrical wiring box
c Rear hook
4 To re-install the cover, first attach the electrical wiring box to the hooks, close
the electrical wiring box, and re-install the screw.
NOTICE
When closing the electrical wiring box cover, make sure that the tightening torque
does NOT exceed 2.0(±0.2)N•m.
6.3 Mounting the indoor unit
In this chapter
6.3.1 To install the mounting plate................................................................................................................................. 27
6.3.2 To drill a wall hole .................................................................................................................................................. 28
6.3.3 To remove the pipe port cover.............................................................................................................................. 29
6.3.1 To install the mounting plate
1 Install the mounting plate temporarily.
2 Level the mounting plate.
3 Mark the centres of the drilling points on the wall using a tape measure.
Position the end of tape measure at symbol " ".
4 Finish the installation by securing the mounting plate on the wall using
M4×25L screws (field supply).
INFORMATION
The removed pipe port cover can be kept in the mounting plate pocket.