4 | Components
Service manual
49
RXJ20~50A + FTXJ-A(W)(S)(B)
Split Emura 3 R32
ESIE22-04 – 2022.04
DANGER: RISK OF ELECTROCUTION
Wait for at least 10 minutes after the circuit breaker has been turned OFF, to be sure
the rectifier voltage is below 10VDC before proceeding.
2 Loosen and remove the screws that fix the top plate.
a b a aa aa
a Screw
b Top plate
3 Remove the top plate.
To remove the front plate
INFORMATION
This procedure is just an example and may differ on some details for your actual unit.
Prerequisite: Remove the top plate, see "4.1Plate work"[448].
1 Loosen and remove the screws that fix the front plate.
a
a
a
a
a
a
a Screw
b Front plate
2 Remove the front plate.
To remove the switch box
INFORMATION
This procedure is just an example and may differ on some details for your actual unit.
Prerequisite: Stop the unit operation via the user interface.
Prerequisite: Turn OFF the respective circuit breaker.
Prerequisite: Remove the required plate work, see "4.1Plate work"[448].
1 Remove the insulation on the upper side of the switch box.