EasyManua.ls Logo

Daikin FTXN09KEVJU - Main Circuit Short Check

Daikin FTXN09KEVJU
244 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SiUS041111 Check
Service Diagnosis 125
5.12 Main Circuit Short Check
Check No.20
Note: Check to make sure that the voltage between (+) and (–) of the diode bridge (DB1) is approx.
0 V before checking.
Measure the resistance between the pins of the DB1 as below.
If the resistance is or less than 1 kW, short circuit occurs on the main circuit.
09/12 class
(–) terminal of the tester (in
case of digital, (+) terminal)
~ (2, 3) + (4) ~ (2, 3)
(1)
(+) terminal of the tester (in
case of digital, (–) terminal)
+ (4) ~ (2, 3)
(1)
~ (2, 3)
Resistance is OK.
several k
~ several M

several k
~ several M
Resistance is NG. 0 or 000 or
Tester
–~~+
1
2
3
4
+
(R14675)

Table of Contents

Other manuals for Daikin FTXN09KEVJU

Related product manuals