EasyManua.ls Logo

Daikin FTXN15KVJU - Trial Operation and Field Settings; Part

Daikin FTXN15KVJU
244 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SiUS041111
220 Trial Operation and Field Settings
Part 8
Trial Operation and
Field Settings
1. Pump Down Operation............................................................................221
2. Forced Cooling Operation.......................................................................222
3. Trial Operation ........................................................................................223
4. Field Settings ..........................................................................................224
4.1 Model Type Setting .................................................................................. 224
4.2 Temperature Display Switch .................................................................... 224
4.3 When 2 Units are Installed in 1 Room...................................................... 225
4.4 Facility Setting Switch (cooling at low outdoor temperature).................... 226
4.5 Jumper Settings ....................................................................................... 227
5. Application of Silicon Grease to a Power Transistor and a
Diode Bridge ...........................................................................................228

Table of Contents

Other manuals for Daikin FTXN15KVJU

Related product manuals