EasyManua.ls Logo

Daikin FTXN25KEV1B - Page 138

Daikin FTXN25KEV1B
158 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Outdoor Unit SiBE041102_A
128 Removal Procedure
2. Remove the electrical box.
1
Remove the electrical
box.
3. Remove the reactor.
1
Remove the 4 screws
and remove the reactor.
4. Remove the thermistors.
Pay attention so as not to
lose the fixture.
When reassembling, do not
insert the thermistor up to
the dent of fixture.
1
Release the discharge
pipe thermistor.
Step
Procedure Points
Electrical box
(R14516)
Reactor
(R14517)
Discharge pipe
thermistor
(R14518)
Dent
Fixture
(R11740)

Table of Contents

Other manuals for Daikin FTXN25KEV1B

Related product manuals