EasyManua.ls Logo

Daikin FTXN25MV1B - Ceiling Cassette; Preliminary Site Survey

Daikin FTXN25MV1B
50 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
Application Information
Ceiling Cassette
Drain Piping Thermal Insulation
Wrap the insulated pipe with the
finishing tape from bottom to top
Air Discharge Louver
Air Filter
(behind the grille)
Front Panel
Air Intake Grille
Preliminary Site Survey
Electrical supply and installation is to con rm to local authority’s (e.g. National Electrical Board) codes and
regulations.
• Voltage supply uctuation must not exceed ± 10% of rated voltage. Electricity supply lines must be
independent of welding transformers which can cause high supply uctuation.
Ensure that the location is convenient for wiring, piping and drainage.
The indoor unit must be installed in such that free from any obstacles in path of cool air discharge and
warm air return, and must allow spreading or air throughout the room (near the centre of the room).
Clearance must be provided for the indoor unit from the wall and obstacles as shown in the gure.
Min 1.0 m
Max 3.0 m
Floor
Obstacles
Min 0.5 m Min 0.5 m
Min 0.5 m
Max 3.0 m
Beam
The installation place must be strong enough to support a load of 4 times the indoor unit weight to avoid
amplifying noise and vibration.
The installation place (handling ceiling surface) must be level and the height in the ceiling is 350mm or
more.

Table of Contents

Other manuals for Daikin FTXN25MV1B

Related product manuals