EasyManua.ls Logo

Daikin FTXN25MV1B - Unit Installation; Unit Hanging; Ffq-Cxv1

Daikin FTXN25MV1B
50 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
Application Information
Unit Installation
15.0
538.0
18.0
38.0
505.0
32.0
580.0 ~ 610mm (CEILING OPENING MEASUREMENT)
580.0 ~ 610mm (CEILING OPENING MEASUREMENT)
529.0
88.0
448.0
19.0
FFQ-CXV1
The indoor unit must be away from heat and steam sources (avoid installing it near an entrance).
Measure and mark the position for the hanging rod. Drill the hole for the angle nut on the ceiling and x the
hanging rod.
The installation template is extended according to temperature and humidity. Check on dimensions in
using.
The dimensions of the installation template are same as those of the ceiling opening dimensions.
Before ceiling laminating work is completed, be sure to t the installation template to the indoor unit.
Note: Be sure to discuss the ceiling drilling work with the installers concerned.
Unit Hanging
Indoor Unit
Ceiling
Board
30.0mm
FFQ-CXV1
• Con rm the pitch of the hanging rod is 770mm x 622mm sharp.
Hold the unit and hand it on the hanging rod with the nut and washer.
Adjust the unit height to 35.0mm between the indoor unit bottom surface and the ceiling surface.
• Con rm with a level gauge that the unit is installed horizontally and tighten the nut and bolt to prevent unit
falling and vibration.
Open the ceiling board along the outer edge of the paper installation template.

Table of Contents

Other manuals for Daikin FTXN25MV1B

Related product manuals